West Texas AI Project Ledger

Every identified project, what its dollar figure actually measures, how far along it is, and where each number comes from. Counted once, labeled honestly. As of 2026-10-24.

This is the data behind The AI Empire in Plain Sight, XNewsAi's investigation. Totals update when a project is added, resized, cancelled or completed. Money that is not investment, such as contract revenue, is listed separately and never added in.

Identified project values · West Texas · as of 2026-10-24

$119.5B–$139.5B

Identified project values — gross, mixed definitions. This is not the amount already invested, financed or spent.

The range adds every West Texas AI-related project we could document and put a dollar figure on, each counted once and each labeled by what its number actually measures: company capital estimates, state building registrations, financing programs, approved university budgets and requests. It excludes contract revenue, capacity-only projects and anything we could not tie to West Texas.

  • Completed / operational
  • Under construction (independently verified)
  • Financed / contracted
  • Approved / registered
  • Announced / planned
  • Requested / contingent
$27.9BDocumented in a filing, registration, financing program or approved budget
$91.5B–$111.5BAnnounced or planned only — 62% of the midpoint is a single company estimate (Fermi's)
$71MRequested and not yet appropriated
None verifiedDollars confirmed spent on completed AI facilities. What is verified operating is measured in megawatts: Galaxy's Helios Phase I (133 MW of IT load delivered) and part of Stargate Abilene
RegionIdentified project valuesWhat is in it
806 — Lubbock, Amarillo, the Panhandle and South Plains$89.9B–$109.9B9 projects
940 — Childress and the Rolling Plains$7.2B1 projects
325 — Abilene and the Big Country$15B1 projects
432 — The Permian Basin$7.4B2 projects
West Texas combined$119.5B–$139.5BGross, mixed definitions; not an investment total
Of which: documented$27.9BA filing, state registration, financing program or approved budget
Of which: announced or planned$91.5B–$111.5BCompany estimates and announcements only
Of which: requested$71MNot appropriated

THE MAP: WHAT IS WHERE, AND HOW REAL IT IS

Every project with a documented location, numbered to match the key below. Marker size follows the largest figure we found for it; the outline and fill show how far along it is. Pick a status to dim the rest, or select a marker to jump to its row in the ledger. Locations are schematic — placed by county or town, not at surveyed sites.

  1. Matador · 806 · $70B–$90B
  2. QTS–Lancium · 806 · $10B
  3. Caprock · 806 · $5B
  4. Amazon Floydada · 806 · $1.2B
  5. Helios · 806 · $3.5B
  6. Texas Tech NVIDIA · 806 · $25M
  7. Reese · 806 · $50.6M
  8. Cleanroom · 806 · $13M
  9. Texas Tech request · 806 · $71M
  10. Hyper (Childress) · 940 · $7.2B
  11. Crusoe–Lancium · 940 · no dollar figure
  12. Stargate Abilene · 325 · $15B
  13. Frontier · 325 · no dollar figure
  14. Kilby · 432 · $6.5B
  15. Amazon Fort Stockton · 432 · $900M

Squares are approved or registered filings; solid circles are financed or contracted; hatched circles are announced or planned; dashed rings are requests or projects with no dollar figure yet. Nothing on this map is shown as completed spending, because no completed spending has been verified.

FOUR REGIONS, FOUR DASHBOARDS

Telephone area codes are an editorial grouping here, not official investment or governmental boundaries.

806 — Lubbock, Amarillo, the Panhandle and South Plains

Identified project values: $89.9B–$109.9B — gross, mixed definitions.

StatusIdentified valuesProjects (largest figure found)
Completed / operational——
Under construction (independently verified)——
Financed / contracted——
Approved / registered$4.79BAmazon Floydada ($1.2B), Helios ($3.5B), Texas Tech NVIDIA ($25M), Reese ($50.6M), Cleanroom ($13M)
Announced / planned$85B–$105BMatador ($70B–$90B), QTS–Lancium ($10B), Caprock ($5B)
Requested / contingent$71MTexas Tech request ($71M)
Not yet quantifiable—None identified
Area subtotal$89.9B–$109.9BCounted once each; contract revenue and generation capacity are not added

940 — Childress and the Rolling Plains

Identified project values: $7.2B — gross, mixed definitions.

StatusIdentified valuesProjects (largest figure found)
Completed / operational——
Under construction (independently verified)——
Financed / contracted——
Approved / registered$7.2BHyper (Childress) ($7.2B)
Announced / planned——
Requested / contingent——
Not yet quantifiable—Crusoe–Lancium (1 GW campus on 270 acres announced July 2026, construction expected to begin in Q3 2026)
Area subtotal$7.2BCounted once each; contract revenue and generation capacity are not added

325 — Abilene and the Big Country

Identified project values: $15B — gross, mixed definitions.

StatusIdentified valuesProjects (largest figure found)
Completed / operational——
Under construction (independently verified)——
Financed / contracted$15BStargate Abilene ($15B)
Approved / registered——
Announced / planned——
Requested / contingent——
Not yet quantifiable—Frontier (More than $25B per Vantage)
Area subtotal$15BCounted once each; contract revenue and generation capacity are not added

432 — The Permian Basin

Identified project values: $7.4B — gross, mixed definitions.

StatusIdentified valuesProjects (largest figure found)
Completed / operational——
Under construction (independently verified)——
Financed / contracted——
Approved / registered$900MAmazon Fort Stockton ($900M)
Announced / planned$6.5BKilby ($6.5B)
Requested / contingent——
Not yet quantifiable—None identified
Area subtotal$7.4BCounted once each; contract revenue and generation capacity are not added

THE LEDGER

ProjectFigureWhat the number measuresStatusBasis and sources
Fermi America — Project Matador
806 · Carson County, outside Amarillo
Developer: Fermi Inc. Customer: TensorWave (lease signed, not closed). Landlord: Texas Tech University System.
$70B–$90B Company estimate of total capital needs across all phases; not financed or spent
Capacity: About 11 GW of private-grid generation, expandable to about 17 GW (generation, not computing)
TensorWave lease: 15 years, about $6.5B in contracted revenue, 222 MW of facility power; closing deadline Oct. 31, 2026, conditions include a rent guaranty. AMD credit-support agreement announced Oct. 13 with no terms disclosed.
Announced / planned Primary record read
QTS–Lancium campus
806 · Hall County, near Turkey
Owner of campus: Lancium. Building developer/operator: QTS (Blackstone). Customer not named.
$10B "More than $10 billion" in expected capital investment (company figure); no megawatt figure given Announced / planned Primary record read
Aligned — Project Caprock
806 · Hale County, outside Abernathy
Developer/operator: Aligned Data Centers. Construction: Ryan Companies. Power: Xcel Energy. Customer not named.
$5B "Aligned expects" $5B. Its release says both "infuse $5B into the regional economy" and "Anchor $5B in Investments" and never separates them, so this may be economic contribution, not capital spending
Capacity: 540 MW campus; first building targeted for 2027
Announced / planned Primary record read
Amazon — Horizon Junction, Floydada
806 · Floyd County, Floydada
Owner: Amazon Data Services, Inc.
$1.2B Four buildings at $300M each: the owner's estimated construction cost on state registrations; excludes servers and power. A fifth record is a $2M water building
Building A is filed as "Confidential Data Center" and is tied to Horizon Junction by address, owner, cost and dates.
Approved / registered Primary record read
Galaxy — Helios
806 · Dickens County, near Afton
Owner/operator: Galaxy Digital. Customer: CoreWeave (15-year lease).
$3.5B Combined $3.5B of Phase 2 building permits (KTSM). The earlier "$4.3B" could not be found in any source
Capacity: Phase I complete: 133 MW of critical IT load delivered to CoreWeave (operational). Approved capacity has expanded to 1.63 GW — approved, not built
Approved / registered Secondary report
Texas Tech — NVIDIA computing project
806 · Lubbock County, Lubbock
Texas Tech University System; equipment bought through vendor ThisWay Global, Inc.
$25M The system says it is investing $25 million in the NVIDIA platform. Regents' May 7 agenda asked to authorize a project budget of up to $40 million (about $25.7M racks plus renovation); the outcome of that item could not be verified Approved / registered Secondary report
Texas Tech — Reese critical-infrastructure security site
806 · Lubbock County, Lubbock (Reese)
Texas Tech University System
$50.6M Project budget ($50,587,377); listed at the design / pre-construction stage Approved / registered Primary record read
Texas Tech — semiconductor cleanroom
806 · Lubbock County, Lubbock
Texas Tech University System; Texas Semiconductor Innovation Fund grant of $12 million
$13M Project budget ($12,988,103) at design / pre-construction. The $12M state grant is a separate figure, and the university describes a $24M total with its match; the figures are not reconciled and are not added Approved / registered Primary record read
Texas Tech — advanced-computing expansion request
806 · Lubbock County, Lubbock
Texas Tech University System, asking the Legislature
$71M Legislative appropriations request for 2028–29 ($37M in FY2028, $34.1M in FY2029); not appropriated Requested / contingent Secondary report
Project Hyper — Childress buildings
940 · Childress County, Childress County
Owners on the filings: Childress DC1, DC2 and DC3 LLC (design firm HKS). Press links the project to Crusoe/Lancium; the records do not name them.
$7.2B Three buildings at $2.4B each ($7.2B is our arithmetic): the owner's estimated construction cost on state registrations; not financing Approved / registered Primary record read
Crusoe–Lancium Childress campus
940 · Childress County, Childress
Land: Lancium. Designer/operator: Crusoe. Customer: an unnamed hyperscaler.
Not yet quantifiable 1 GW campus on 270 acres announced July 2026, construction expected to begin in Q3 2026; no dollar figure disclosed Announced / planned Primary record read
Stargate Abilene — Crusoe, Blue Owl and Primary Digital
325 · Taylor (Abilene) County, Abilene
Developer/operator: Crusoe. Funding partners: Blue Owl Capital and Primary Digital Infrastructure. Land and power: Lancium. Tenant: Oracle, with OpenAI as the user (reported).
$15B A $15 billion joint-venture funding program for the 1.2 GW campus (Crusoe, May 21, 2025). Not the $500B national Stargate target, and not OpenAI's money
Capacity: Epoch AI estimated about 0.3 GW operating in April 2026 and 1.2 GW projected
Financed / contracted Primary record read
Vantage — Frontier
325 · Shackelford County, Albany area
Developer: Vantage. Oracle as owner and OpenAI as user (reported).
Not yet quantifiable More than $25B per Vantage; Epoch AI estimates $53B for 1.4 GW. Held out of the total until the primary pages and the area-code assignment are verified Announced / planned Relayed — primary page not readable
Chevron–Microsoft — Project Kilby
432 · Reeves County, Reeves County
Applicant: Energy Forge One LLC (a Chevron subsidiary). Customer: Microsoft (20-year power agreement).
$6.5B $6.5 billion proposed investment in the Texas JETI tax-limitation application for the power plant — not Microsoft's data-center cost. Chevron has not disclosed a cost; press estimates run $7B–$9B
Capacity: About 2.67 GW of generation capacity in phases (generation, not computing); final investment decision targeted before year-end 2026
Announced / planned Primary record read
Amazon — Pecos County data center
432 · Pecos County, near Fort Stockton
Owner: Amazon Data Services, Inc.
$900M Three buildings at $300M each: the owner's estimated construction cost. Buildings A and B were read in the state records; Building C relies on a trade-press summary Approved / registered Primary record read

Money that is not investment, kept out of the total

ItemAmountKindWhy it is not added
Fermi–TensorWave 15-year lease$6.5Blease revenueContracted revenue to Fermi if the lease closes. It is not added to Fermi's capital-needs estimate.

Also left out:

  • Google's $40 billion Texas announcement (statewide through 2027; no West Texas share is documented)
  • The $500 billion national Stargate target (never assigned to Abilene)
  • ERCOT's roughly $4.1 billion Panhandle 765 kV transmission plan (still in study, not a project)
  • Microsoft's reported rental of about 700 MW next to Stargate in Abilene (no dollar figure; not confirmed on the record)

WHO IS CONNECTED TO WHOM

ProjectTexas Tech System rolePublic bodies, incentives and conditions found
Fermi America — Project Matador Documented. 99-year ground lease from the Texas Tech System (Ex. 10.9 to Fermi's S-11); Fermi needs a notice to proceed by Dec. 31, 2026, tied to a Phase 1 tenant of at least 200 MW. Texas Tech System Board of Regents (landlord); Carson County (10-year property-tax abatement approved Oct. 2025); TCEQ (air permit); City of Amarillo (water)
QTS–Lancium campus None found. No Texas Tech role found. None named; the companies say they fund 100% of the energy infrastructure improvements
Aligned — Project Caprock None found. No Texas Tech role found. City of Abernathy (supportive); no incentives stated
Amazon — Horizon Junction, Floydada None found. No Texas Tech role found. TDLR (registration); no incentives found
Galaxy — Helios None found. No Texas Tech role found. Not researched
Texas Tech — NVIDIA computing project Documented. Texas Tech System project. Texas Tech System Board of Regents (purchase made under a chairman's exigent-circumstances approval, acknowledged by the board in February)
Texas Tech — Reese critical-infrastructure security site Documented. Texas Tech System construction project. Texas Tech System
Texas Tech — semiconductor cleanroom Documented. Texas Tech System project with a state grant. Texas CHIPS Office / Governor's office (grant); Texas Tech System
Texas Tech — advanced-computing expansion request Documented. Texas Tech System request. Texas Legislature (convenes January)
Project Hyper — Childress buildings None found. No Texas Tech role found. TDLR (registered Sept. 11, 2026); no incentives found
Crusoe–Lancium Childress campus None found. No Texas Tech role found. None found
Stargate Abilene — Crusoe, Blue Owl and Primary Digital None found. No Texas Tech role found. Not researched
Vantage — Frontier None found. No Texas Tech role found. Not researched
Chevron–Microsoft — Project Kilby None found. No Texas Tech role found. Texas Comptroller (JETI agreement posted July 24, 2026); Pecos-Barstow-Toyah ISD
Amazon — Pecos County data center None found. No Texas Tech role found. TDLR (registered Aug. 4, 2026); no incentives found

"None found" means we looked and found no role in the sources we could read. It is not a finding that no relationship exists. A role being documented does not by itself show influence over any decision.